habiloid / Wikimedia Commons · CC BY-SA 2.0Where can a process be taken from lab bench to pilot scale in Britain?
The stretch between a working lab process and a production plant is where most British scale-ups stall. This is the evidenced capability in Teesside and the wider North East, and how contracted access works.
Evidence on this page was last verified 2026-08-19. Where a claim cannot be sourced, UKIZ withholds it rather than estimating.
Available here
Capability the evidence places in this ecosystem itself.
Bioprocess scale-up
Our bioprocess capability is used across both microbial fermentation development and mammalian cell development.
Centre for Process Innovation — National Biologics Manufacturing Centre, Darlington
How you get in: Collaborative or contract project agreement with CPI
Conditions: Project-by-project agreement
Source: CPI - National Biologics Manufacturing Centre · verified 2026-08-19
Connected UK route
Not local, but reachable. Britain shares this capability nationally.
Pilot-scale fermentation
Fermentation at hundreds to thousands of litres with downstream recovery
Centre for Process Innovation — National Industrial Biotechnology Facility — Wilton and Darlington, Teesside
How you get in: Contract development project or grant-funded consortium
Conditions: Booked capacity; lead times and cost are the binding constraint, not existence
Source: CPI Biotechnology · verified 2026-08-19
Cell and gene therapy manufacture to GMP
GMP-grade cleanroom manufacture for advanced therapies
Cell and Gene Therapy Catapult manufacturing centre — Stevenage
How you get in: Contracted tenancy or manufacturing agreement with the centre
Conditions: Capacity is contracted well ahead; entry requires a defined process and a regulatory pathway
Source: Cell and Gene Therapy Catapult · verified 2026-08-19
Pilot production
Pilot-scale production of a novel material outside laboratory quantities
Materials Processing Institute — Middlesbrough, Teesside
How you get in: Commercial contract research
Conditions: Out of Zone
Source: Materials Processing Institute · verified 2026-08-19
Pilot-scale fermentation (Scotland route)
Alternative regional pilot fermentation and bioprocess scale-up
IBioIC / FlexBio scale-up centre, Heriot-Watt University — Edinburgh
How you get in: IBioIC membership or contracted project
Conditions: Membership or project agreement required
Source: Industrial Biotechnology Innovation Centre · verified 2026-08-19
Downstream processing & formulation
Separation, purification and formulation at pilot scale
Centre for Process Innovation — Wilton, Teesside
How you get in: Contract development project
Source: CPI Biotechnology · verified 2026-08-19
Battery industrialisation
Pre-production battery cell scale-up between lab and gigafactory
UK Battery Industrialisation Centre — Coventry
How you get in: Contracted industrialisation project
Conditions: Capacity is contracted; queueing applies
Source: UK Battery Industrialisation Centre · verified 2026-08-19
Formulation and process scale-up
Scale-up of formulated materials and coatings
CPI — Sedgefield and Wilton, Teesside
How you get in: Commercial contract with CPI
Conditions: Out of Zone. Same national provider already recorded for Engineering Biology — a shared national asset, not a duplicate facility
Source: CPI · verified 2026-08-19
Biologics and biopharmaceutical process scale-up
Pilot-to-commercial scale bioprocessing outside a company own plant
CPI National Biologics Manufacturing Centre — Darlington
How you get in: Contracted development or manufacturing project with CPI
Conditions: Booked project by project; not open-access facility time
Source: CPI · verified 2026-08-19
Component manufacture
Turning a validated material into a manufacturable component
University of Sheffield AMRC — Rotherham, South Yorkshire
How you get in: Membership or commercial project
Conditions: Out of Zone
Source: AMRC · verified 2026-08-19
Access with conditions
Real capability, on terms worth knowing before you plan around it.
Volume cell manufacturing
Gigafactory-scale cell production
AESC Sunderland (operating and expanding); Agratas Somerset (under construction) — Sunderland; Bridgwater
How you get in: Commercial supply agreement
Conditions: Somerset capacity depends on construction completion later this decade; offtake terms apply
Source: UK Battery Strategy, HM Government · verified 2026-08-19
Other access questions
- Laboratory space in Cambridge
Can a small team get fitted lab space in Cambridge, and on what terms?
- GMP and cell and gene manufacturing in Stevenage
Where can a therapeutics company have GMP material made in Britain?
- Cleanroom and nanofabrication access in Glasgow
Where can a photonics or quantum device be prototyped in Britain?
- National capability routes across Britain
What can you reach anywhere in Britain, even when it is not local?