Where can a process be taken from lab bench to pilot scale in Britain?

The stretch between a working lab process and a production plant is where most British scale-ups stall. This is the evidenced capability in Teesside and the wider North East, and how contracted access works.

Evidence on this page was last verified 2026-08-19. Where a claim cannot be sourced, UKIZ withholds it rather than estimating.

Available here

Capability the evidence places in this ecosystem itself.

  • Bioprocess scale-up

    Our bioprocess capability is used across both microbial fermentation development and mammalian cell development.

    Centre for Process Innovation — National Biologics Manufacturing Centre, Darlington

    How you get in: Collaborative or contract project agreement with CPI

    Conditions: Project-by-project agreement

    Source: CPI - National Biologics Manufacturing Centre · verified 2026-08-19

Connected UK route

Not local, but reachable. Britain shares this capability nationally.

  • Pilot-scale fermentation

    Fermentation at hundreds to thousands of litres with downstream recovery

    Centre for Process Innovation — National Industrial Biotechnology Facility — Wilton and Darlington, Teesside

    How you get in: Contract development project or grant-funded consortium

    Conditions: Booked capacity; lead times and cost are the binding constraint, not existence

    Source: CPI Biotechnology · verified 2026-08-19

  • Cell and gene therapy manufacture to GMP

    GMP-grade cleanroom manufacture for advanced therapies

    Cell and Gene Therapy Catapult manufacturing centre — Stevenage

    How you get in: Contracted tenancy or manufacturing agreement with the centre

    Conditions: Capacity is contracted well ahead; entry requires a defined process and a regulatory pathway

    Source: Cell and Gene Therapy Catapult · verified 2026-08-19

  • Pilot production

    Pilot-scale production of a novel material outside laboratory quantities

    Materials Processing Institute — Middlesbrough, Teesside

    How you get in: Commercial contract research

    Conditions: Out of Zone

    Source: Materials Processing Institute · verified 2026-08-19

  • Pilot-scale fermentation (Scotland route)

    Alternative regional pilot fermentation and bioprocess scale-up

    IBioIC / FlexBio scale-up centre, Heriot-Watt University — Edinburgh

    How you get in: IBioIC membership or contracted project

    Conditions: Membership or project agreement required

    Source: Industrial Biotechnology Innovation Centre · verified 2026-08-19

  • Downstream processing & formulation

    Separation, purification and formulation at pilot scale

    Centre for Process Innovation — Wilton, Teesside

    How you get in: Contract development project

    Source: CPI Biotechnology · verified 2026-08-19

  • Battery industrialisation

    Pre-production battery cell scale-up between lab and gigafactory

    UK Battery Industrialisation Centre — Coventry

    How you get in: Contracted industrialisation project

    Conditions: Capacity is contracted; queueing applies

    Source: UK Battery Industrialisation Centre · verified 2026-08-19

  • Formulation and process scale-up

    Scale-up of formulated materials and coatings

    CPI — Sedgefield and Wilton, Teesside

    How you get in: Commercial contract with CPI

    Conditions: Out of Zone. Same national provider already recorded for Engineering Biology — a shared national asset, not a duplicate facility

    Source: CPI · verified 2026-08-19

  • Biologics and biopharmaceutical process scale-up

    Pilot-to-commercial scale bioprocessing outside a company own plant

    CPI National Biologics Manufacturing Centre — Darlington

    How you get in: Contracted development or manufacturing project with CPI

    Conditions: Booked project by project; not open-access facility time

    Source: CPI · verified 2026-08-19

  • Component manufacture

    Turning a validated material into a manufacturable component

    University of Sheffield AMRC — Rotherham, South Yorkshire

    How you get in: Membership or commercial project

    Conditions: Out of Zone

    Source: AMRC · verified 2026-08-19

Access with conditions

Real capability, on terms worth knowing before you plan around it.

  • Volume cell manufacturing

    Gigafactory-scale cell production

    AESC Sunderland (operating and expanding); Agratas Somerset (under construction) — Sunderland; Bridgwater

    How you get in: Commercial supply agreement

    Conditions: Somerset capacity depends on construction completion later this decade; offtake terms apply

    Source: UK Battery Strategy, HM Government · verified 2026-08-19