Capability access

National capability routes across Britain

What can you reach anywhere in Britain, even when it is not local?

Britain shares most of its heavy capability. These are the evidenced national routes, facilities any UK organisation can reach on stated terms, wherever it is based.

Evidence last verified 2026-08-19.

Connected UK route

Not local, but reachable. Britain shares this capability nationally.

  • Characterisation (X-ray)

    Synchrotron characterisation of structure and composition

    Diamond Light Source, Harwell, Oxfordshire

    How you get in: Proprietary Access — paid, confidential, no publication requirement; or peer-reviewed beamtime for publishable work

    Conditions: Out of Zone. Peer-reviewed route is free at point of access but requires publication; commercial confidentiality requires the paid route

    Source: Diamond Light Source — Proprietary Access · verified 2026-08-19

  • Industrial trial

    Trialling a robot application against a real manufacturing process before adoption

    Manufacturing Technology Centre — Robot Experience Centre, Ansty Park, Coventry

    How you get in: Commercial engagement with the MTC

    Conditions: Out of Zone; the capability is national, not Bristol-local

    Source: MTC Robot Experience Centre · verified 2026-08-19

  • Characterisation (neutron)

    Neutron and muon characterisation for bulk structure and dynamics

    ISIS Neutron and Muon Source, Harwell, Oxfordshire

    How you get in: ISIS for business — collaborative R&D or proprietary commercial access

    Conditions: Out of Zone

    Source: ISIS for business · verified 2026-08-19

  • Propulsion test

    Vacuum testing of chemical propulsion thrusters

    National Space Propulsion Test Facility, and Protolaunch, Westcott Venture Park, Buckinghamshire

    How you get in: Open-access route via the UK Space Agency funded NSPTF, or a commercial contract with Protolaunch

    Conditions: Out of Zone. Two parallel routes: publicly funded open access and purely commercial

    Source: National Space Propulsion Test Facility · verified 2026-08-19

  • Autonomous systems test

    Segregated airspace for uncrewed and autonomous systems trials

    West Wales Airport, Aberporth, Aberporth, Ceredigion

    How you get in: Commercial booking

    Conditions: Out of Zone. A February 2026 Defence Growth Deal directs further investment into Welsh autonomous technology capability

    Source: West Wales Airport UAS · verified 2026-08-19

  • Applied validation and translation

    Translating a validated technology into on-farm practice across crops, livestock and engineering

    UK Agri-Tech Centre, Multi-site, UK-wide

    How you get in: Commercial or Innovate UK supported project with the UK Agri-Tech Centre

    Conditions: Formed 1 April 2024 by merging Agri-EPI Centre, CHAP and CIEL into a single Innovate UK core-funded organisation

    Source: UK Agri-Tech Centre · verified 2026-08-19

  • Pilot-scale fermentation

    Fermentation at hundreds to thousands of litres with downstream recovery

    Centre for Process Innovation — National Industrial Biotechnology Facility, Wilton and Darlington, Teesside

    How you get in: Contract development project or grant-funded consortium

    Conditions: Booked capacity; lead times and cost are the binding constraint, not existence

    Source: CPI Biotechnology · verified 2026-08-19

  • Multi-project wafer runs

    Low-volume silicon prototyping through shared wafer runs

    Europractice multi-project wafer service (foundries outside the UK), Europe / Asia foundries

    How you get in: Europractice membership and scheduled MPW run

    Conditions: Fixed run calendars; foreign foundry capacity; export and IP considerations

    Source: Europractice IC Service · verified 2026-08-19

  • Ground autonomy test

    Proving-ground testing for connected and autonomous ground vehicles

    HORIBA MIRA — ASSURED CAV, Nuneaton, Warwickshire

    How you get in: Commercial booking; a named start-up engineering support route exists

    Source: HORIBA MIRA ASSURED CAV · verified 2026-08-19

  • Cell and gene therapy manufacture to GMP

    GMP-grade cleanroom manufacture for advanced therapies

    Cell and Gene Therapy Catapult manufacturing centre, Stevenage

    How you get in: Contracted tenancy or manufacturing agreement with the centre

    Conditions: Capacity is contracted well ahead; entry requires a defined process and a regulatory pathway

    Source: Cell and Gene Therapy Catapult · verified 2026-08-19

  • Manufacture

    Small satellite and spacecraft manufacture

    Glasgow small-satellite cluster and Airbus Defence and Space, Glasgow and Stevenage

    How you get in: Commercial contract manufacture

    Conditions: Out of Zone relative to Harwell; the Zone is genuinely distributed

    Source: Airbus Defence and Space · verified 2026-08-19

  • Certification and standards testing

    Independent certification to international standards

    Independent certification bodies operating in the UK (DNV, Lloyd's Register, TUV), UK-wide, commercial providers

    How you get in: Commercial certification engagement

    Conditions: Cost and duration scale with product class

    Source: ORE Catapult test and validation (route to certification) · verified 2026-08-19

  • Pilot production

    Pilot-scale production of a novel material outside laboratory quantities

    Materials Processing Institute, Middlesbrough, Teesside

    How you get in: Commercial contract research

    Conditions: Out of Zone

    Source: Materials Processing Institute · verified 2026-08-19

  • Pilot-scale fermentation (Scotland route)

    Alternative regional pilot fermentation and bioprocess scale-up

    IBioIC / FlexBio scale-up centre, Heriot-Watt University, Edinburgh

    How you get in: IBioIC membership or contracted project

    Conditions: Membership or project agreement required

    Source: Industrial Biotechnology Innovation Centre · verified 2026-08-19

  • Downstream processing & formulation

    Separation, purification and formulation at pilot scale

    Centre for Process Innovation, Wilton, Teesside

    How you get in: Contract development project

    Source: CPI Biotechnology · verified 2026-08-19

  • Real-world test

    Public-road and real-world environment testing of autonomous systems

    Smart Mobility Living Lab (part of CAM Testbed UK), Greenwich and Stratford, London

    How you get in: Commercial engagement with SMLL or another CAM Testbed UK facility

    Source: Smart Mobility Living Lab · verified 2026-08-19

  • Ingredient and protein scale-up

    Fermentation-based scale-up for alternative proteins and novel ingredients

    CPI, Wilton and Darlington, Teesside

    How you get in: Commercial contract with CPI

    Conditions: Out of Zone. Same national asset already recorded for Engineering Biology; the evidenced national ceiling above roughly 100 m3 applies here too

    Source: CPI · verified 2026-08-19

  • Real-world deployment trial

    Public environment trials ahead of deployment

    Smart Mobility Living Lab and CAM Testbed UK, London and nationally

    How you get in: Commercial engagement with a CAM Testbed UK facility

    Conditions: Out of Zone; a national consortium of seven facilities

    Source: Smart Mobility Living Lab · verified 2026-08-19

  • Battery industrialisation

    Pre-production battery cell scale-up between lab and gigafactory

    UK Battery Industrialisation Centre, Coventry

    How you get in: Contracted industrialisation project

    Conditions: Capacity is contracted; queueing applies

    Source: UK Battery Industrialisation Centre · verified 2026-08-19

  • Formulation and process scale-up

    Scale-up of formulated materials and coatings

    CPI, Sedgefield and Wilton, Teesside

    How you get in: Commercial contract with CPI

    Conditions: Out of Zone. Same national provider already recorded for Engineering Biology — a shared national asset, not a duplicate facility

    Source: CPI · verified 2026-08-19

  • Biologics and biopharmaceutical process scale-up

    Pilot-to-commercial scale bioprocessing outside a company own plant

    CPI National Biologics Manufacturing Centre, Darlington

    How you get in: Contracted development or manufacturing project with CPI

    Conditions: Booked project by project; not open-access facility time

    Source: CPI · verified 2026-08-19

  • Component manufacture

    Turning a validated material into a manufacturable component

    University of Sheffield AMRC, Rotherham, South Yorkshire

    How you get in: Membership or commercial project

    Conditions: Out of Zone

    Source: AMRC · verified 2026-08-19

  • Aerial autonomy test

    Beyond visual line of sight flight testing over land and sea

    West Wales Airport, Aberporth, Aberporth, Ceredigion

    How you get in: Commercial booking of segregated airspace

    Conditions: Fully authorised BVLOS site with roughly 2,500 sq miles of segregated airspace

    Source: West Wales Airport UAS · verified 2026-08-19

Other access questions

All capability families